Image
Image
Image


Current Projects:


  • Centinela Hospital - LDRP: $360,500.00
    Design and Build 4,760 sq ft labor, delivery and recovery area at the 8th floor of the existing east tower at an in operation medical center. Including (1) C-Section room, (7) new LDRP rooms and required support spaces. Scope includes new panels and feeders to support new areas, new LED lighting & controls and new OSPHD patient support systems.
        Scheduled for completion: 2nd Quarter 2017
        Location: Inglewood, CA.
  • Good Samaritan Medical Center - Lobby Renovation: $250,000.00
    5,230 sq ft renovation of main hospital entrance lobby. Scope includes new LED lighting system including new LC&D lighting control system. Project will be completed in three phases while maintaining main entrance.
        Scheduled for completion: 2nd Quarter 2016
        Location: Los Angeles, CA.
  • CSMC - Le Doux Outpatient G.I. Build-Out: $324,560.00
    5,800 sq ft tenant interiror build-out of a G.I. outpatient surgery suite with three procedure rooms and support spaces. SOW includes new lighting with Wattstopper controls, new power and HVAC system support.
        Scheduled for completion: 1st Quarter 2016
        Location: Beverly Hills, CA.
  • CSMC - SCCT Patient Monitors: $284,900.00
    1,313 sq ft renovation within occupied 250,600 sq ft OSHPD hospital building. Including new LED lighting and controls, new branch power, HVAC system support, new cable tray and LV system conduit with seismic support.
        Scheduled for completion: 1st Quarter 2016
        Location: Los Angeles, CA.
  • Biosense Webster Apt Workshop & Lab Renovation: $27,800.00
    Design and Build 1,229 sq ft lab addition/remodel within 33,700 sq ft occupied labatory building. Scope includes new LED lighting and controls, new branch power and new HVAC equipment support.
        Scheduled for completion: 2nd Quarter 2016
        Location: Irwindale, CA.
  • CSUF West - Library Building Renovation: $717,360.00
    Design and Build 28,825 sq ft 3-story office building renovation. Scope includes new LED lighting and controls, new branch circuits, new HVAC equipment support and new panels.
        Scheduled for completion: 3rd Quarter 2016
        Location: Fullerton, CA.
  • VCA Structural T.I.: $187,750.00
    13,580 sq ft office space renovation within a 36,800 sq ft 3-story occupied office building. Scope includes retrofitted dimmable lighting with new lighting controls, new branch power and HVAC equipment support.
        Scheduled for completion: 2nd Quarter 2016
        Location: Orange, CA.
  • CSMC - Lower Level Food & Nutrition Remodel: $170,465.00
    4,530 sq ft remodle of F&N offices, locker rooms, employee restrooms and linen storage area within a 1,566,900 sq ft occupied OSHPD hospital. Scope includes new lighting & controls, new branch circuits, HVAC equipment support, (2) new panels & feeders and 140' of seismic supported cable tray.
        Scheduled for completion: 4th Quarter 2016
        Location: Los Angeles, CA.


Image


Image
Image